Markthal Rotterdam, the first indoor market and housing development in the Netherlands, opened in October after five years of construction at a total estimated cost of €175 million.
The plant engineering company Dürr is building an entire paint shop for the successor model to the Volkswagen Crafter for Volkswagen Poznan Sp.o.o. The resource-saving Eco+Paintshop in Wrzesnia, Poland, will use exceptionally little water, energy and materials. It is one of the biggest projects in Dürr’s history.
A special protective layer has been applied to the outside of Willibrordi Cathedral, which was built in the late Gothic style, in order to protect the city's famous landmark against damaging environmental influences.
The obligations placed on suppliers and importers of treated articles have increased significantly, and now industries with no previous biocide concerns need to consider what steps are needed to ensure compliance.
Due to the low concentration needed, this biocide does not compromise the paint’s chemical structure, color or other cooperative biocides involved. Instead it opens up new formulation possibilities for the active ingredients used in controlling antifouling performance.