A&E Networks is a television production company that produces shows such as The First 48, Longmire and Duck Dynasty. For this project, A&E hired High Performance Systems Corporation, an expert resinous flooring contractor, to install a resinous flooring system in one of their new 3,775 sq. ft. recording studios located in New York City.
As awareness of sustainability and green issues continues to affect specification choices the world over, more developments are turning to terrazzo flooring as the solution.
Monitor Coatings led and R&D project that led to the development of a basecoat plus seal coat that met all functional requirements tested, showing that a solution could be deployed as a system and gaining significant levels of scientific understanding.
Animal attraction has drawn AkzoNobel and Embraer together to develop stunning livery for three of the aircraft maker’s latest line of E2 business jets.
For the coating system itself, the ultra-tolerant Dura-Plate 301 epoxy coating system was chosen for its exceptional durability over water jetted surfaces, due to its tolerance to damp, flash rusted or low roughness steel surfaces.